Pharmaceutical

Johnson & Johnson R&D Laboratory Expansion, Spring House, PA

$134 million expansion project for Johnson & Johnson includes a new 155,000-SF research center lab and 80,000-SF of renovated space in their existing research building. The new research center features perimeter offices for chemistry and biology functions with adjacent interior laboratory spaces designated for either discovery biology or discovery chemistry. The first floor is primarily used for mechanical and building/lab support functions, while the ffh foor, or the roof elevation, also includes an elevated, separately enclosed mechanical penthouse. The existing research building consists of renovated laboratory space within the four-story structure. Significant demolition and renovation (i.e., new walls, infrastructure, doors, ceilings, finishes, furniture) took place on the upper floors, while minor renovations only (finishes and furniture upgrades) occurred on the lower floors. Mechanical and electrical systems were replaced, upgraded and redistributed. The project achieved LEED® Gold certification.  


Almac Group North American Headquarters, Lower Salford, PA

$78 million new building to comprise a 166,600-SF production facility including administration, packaging, warehouse/storage, shipping receiving and label control areas and 75,000-SF of administrative offices with an IT server and communications area. The site development includes new roadways, storm water retention/management system, on-grade parking, site utility infrastructure and landscaping/hardscaping.


Confidential Client –  Parenterals Facility Expansion, Carolina, Puerto Rico

$42 million expansion of existing Building D parenteral production building including increasing capacity of existing utility systems. The main floor consists of a Class 100 filling and sterilization area. The second floor consists of product formulation areas, weigh areas, CIP and mechanical space. The entire third floor houses all mechanical equipment. There is a total of 5,000-SF of Class 100 laminar flow ceiling, class 10,000 formulation area. This is a BL2 facility and is fully validated.